BILECO's residential rate is ₱19.6949/kWh for November 2026, up ₱0.3321 from October. Here's every 2025–2026 monthly rate we could verify, BILECO's own breakdown of the rate, sample bills at 100–300 kWh, and honest solar math.

BILECO's residential rate for November 2026 is ₱19.6949 per kWh, VAT included (BILECO). That's ₱0.3321 more than October's ₱19.3628, the fourth straight monthly increase after July's ₱18.3407 (August through November, on BILECO's own posts). July was also a jump from June's ICSC figure of ₱15.12; BILECO did not post a June 2026 rate. BILECO posted the November rate on 20 November 2026.

Mahal na gyud ang kuryente. ICSC ranked BILECO #1 among on-grid utilities for residential rates in July 2026 (ICSC). Below: every monthly rate we could verify, sample bills, and honest solar math.

Monthly rates, the rate breakdown and sample bills checked 20 November 2026. Other sections last checked 4 October 2026. We update this page when BILECO posts a new rate.

Want to see what this rate means on your own bill? Try our electricity bill calculator.

Note on July: BILECO's post prints "18.34.07". We read it as ₱18.3407: in every BILECO post we checked, residential is exactly ₱1.5054 above commercial (₱16.8353 + ₱1.5054 = ₱18.3407), and ICSC lists ₱18.34.

BILECO monthly residential rates, 2025–2026

Month

Residential rate (₱/kWh)

Source

Jan 2025

14.8783

BILECO

Feb 2025

15.0656

BILECO

Mar 2025

14.4864

BILECO

Apr 2025

15.18

PRESYO-PH (ICSC)

May 2025

13.81

PRESYO-PH (ICSC)

Jun 2025

12.57

PRESYO-PH (ICSC)

Jul 2025

12.72

PRESYO-PH (ICSC)

Aug 2025

12.73

PRESYO-PH (ICSC)

Sep 2025

15.67

PRESYO-PH (ICSC)

Oct 2025

13.77

PRESYO-PH (ICSC)

Nov 2025

14.28

PRESYO-PH (ICSC)

Dec 2025

14.51

PRESYO-PH (ICSC)

Jan 2026

17.4415

BILECO

Feb 2026

14.1414

BILECO

Mar 2026

15.7097

BILECO

Apr 2026

15.0929*

BILECO

May 2026

12.9458

BILECO

Jun 2026

15.12

ICSC / PRESYO-PH

Jul 2026

18.3407

BILECO

Aug 2026

18.7587

BILECO

Sep 2026

18.9275

BILECO

Oct 2026

19.3628

BILECO

Nov 2026

19.6949

BILECO

Line chart of BILECO's residential rate per kWh from January 2025 to November 2026. The rate moved between about 12.57 pesos (June 2025) and 15.67 pesos through 2025, reached 17.44 pesos in January 2026, fell to 12.95 pesos in May 2026, then rose every month on BILECO's posts: 18.34 in July, 18.76 in August, 18.93 in September, 19.36 in October and 19.69 pesos in November 2026.
BILECO residential rate by month, January 2025 to November 2026. Sources: BILECO's monthly effective-rate posts and PRESYO-PH (ICSC) for months BILECO didn't post.

* For April 2026, PRESYO-PH shows ₱15.41. We list BILECO's own posted figure.

From January 2026 on, every month except June comes from BILECO's own posts. For April–December 2025 and June 2026 we use PRESYO-PH, ICSC's tracker compiled from co-op rate disclosures. The two don't always match: for January–March 2026, PRESYO-PH shows ₱17.76, ₱14.46 and ₱16.03, while BILECO's posts say ₱17.4415, ₱14.1414 and ₱15.7097. All rates include VAT.

The swing is big: from ₱12.9458 in May 2026 to ₱19.6949 in November. That's ₱6.75 more per kWh, or about 52% higher, in six months.

What's inside the BILECO rate

BILECO says its rate has nine components (BILECO billing info):

  • Generation charge: the cost of power bought from generators. BILECO says it's "roughly 45%" of the monthly rate.
  • Transmission charge: paid for delivery over NGCP's grid.
  • System loss charge: power lost between delivery and billing. ERC caps how much can be passed on (Leyte Samar Daily News).
  • Distribution charge: distribution, supply and metering. This is fixed unless ERC approves a change.
  • Reinvestment Fund for Sustainable CAPEX: pays for network rehabilitation, upgrades and expansion.
  • Universal charge: set by ERC and remitted to PSALM. It covers missionary electrification, environmental charges and REDCI.
  • Lifeline and senior citizen discounts/subsidies.
  • VAT.

BILECO now attaches a signed unbundled rate schedule to its monthly rate posts (November 2026, October 2026). Here's the residential rate split into its main parts:

Component (₱/kWh)

Oct 2026

Nov 2026

Change

Generation

10.3315

10.4083

+0.0768

Transmission (incl. ancillary services)

1.9338

2.1154

+0.1816

System loss

1.8394

1.8666

+0.0272

Distribution, supply and metering

2.6631

2.6631

no change

MCC

0.5324

0.5324

no change

Universal charges (incl. FIT-All)

0.8557

0.8557

no change

Lifeline, senior citizen and REC lines

0.0200

0.0202

+0.0002

VAT (on generation, transmission, ancillary)

1.1869

1.2332

+0.0463

Total effective rate

19.3628

19.6949

+0.3321

Bar chart of BILECO's residential rate by component, October vs November 2026, in pesos per kWh. Generation 10.3315 to 10.4083 (up 0.0768). Distribution, supply and metering 2.6631, no change. Transmission including ancillary services 1.9338 to 2.1154 (up 0.1816). System loss 1.8394 to 1.8666 (up 0.0272). VAT 1.1869 to 1.2332 (up 0.0463). Universal charges 0.8557 and MCC 0.5324, no change. Lifeline, senior and REC lines 0.0200 to 0.0202. Total 19.3628 to 19.6949, up 0.3321.
What moved in BILECO's November 2026 residential rate. Source: BILECO's signed unbundled rate schedules for October and November 2026; groupings are Solar Leyte calculations.

Groupings are ours. Transmission is the transmission system charge (₱0.7921 in November) plus the ancillary service charge (₱1.3233). Distribution, supply and metering is ₱1.0557 + ₱1.0282 + ₱0.5792. Universal charges are missionary electrification ₱0.3296, environmental ₱0.0025, cash incentive for RE developers ₱0.0101, FIT-All ₱0.4707 and NPC stranded debt ₱0.0428. The lines add up exactly to BILECO's ₱19.6949 (Solar Leyte calculation).

Generation is 52.8% of November's residential rate (₱10.4083 ÷ ₱19.6949), higher than the "roughly 45%" on BILECO's billing page. The schedule also lists a ₱5.00 residential retail customer charge under metering (shown as "Fixed charged 5.0000"), which sits outside the per-kWh rate.

What moved in November

Almost only pass-through lines changed. Transmission rose ₱0.1816 per kWh (₱0.1522 of it in the transmission system charge), generation ₱0.0768, system loss ₱0.0272, and the VAT on those lines ₱0.0463. Distribution, supply, metering, MCC and universal charges stayed the same. The senior-citizen subsidy line rose ₱0.0002 (₱0.0011 to ₱0.0013). On a 200 kWh bill, the ₱0.3321 increase adds about ₱66 a month (200 × ₱0.3321 = ₱66.42).

Why the rate changes month to month

Generation and transmission are pass-through costs. BILECO passes them on "without any additions or reductions," so they drive most of the monthly swing (BILECO).

In 2026, two pressures hit Eastern Visayas hard:

  • Spot-market prices. When supply is short, co-ops buy from the WESM. During yellow alerts, pricier diesel plants run, and that raises generation charges. BILECO General Manager Gerardo N. Oledan explained this in a PIA Biliran report.
  • Line loss and congestion costs (LLCC). IEMOP billed the region's 11 co-ops ₱572.9 million in LLCC for July 2026 alone (Daily Tribune). The same report said that under normal computation, Biliran's July rate "would have reached" ₱24.35/kWh. Co-ops staggered WESM pass-throughs to soften it. (That report gives a different staggered July figure than BILECO's posted rate. We use BILECO's posted rate.)

What a BILECO bill looks like at 100, 200 and 300 kWh

Plain math: kWh × effective rate.

Monthly use

At ₱19.6949 (Nov 2026, BILECO)

At ₱19.3628 (Oct 2026, BILECO)

100 kWh

100 × 19.6949 = ₱1,969.49₱1,834.07

100 × 19.3628 = ₱1,936.28₱1,893.00

200 kWh

200 × 19.6949 = ₱3,938.98₱3,668.14

200 × 19.3628 = ₱3,872.56₱3,786.00

300 kWh

300 × 19.6949 = ₱5,908.47₱5,502.21

300 × 19.3628 = ₱5,808.84₱5,679.00

Your actual bill can differ slightly. BILECO's schedule lists a separate ₱5.00 residential fixed charge, and lifeline or senior citizen discounts or adjustments may apply, so check your statement.

How BILECO compares with LEYECO II and nearby co-ops

Residential ₱/kWh, from PRESYO-PH (ICSC's tracker, compiled from co-op rate disclosures):

Co-op

Jul 2026

Aug 2026

Sep 2026

BILECO

18.34

18.76

18.93

LEYECO II (Tacloban, Palo, Babatngon)

12.29

11.61

14.05

LEYECO III

15.70

n/a

n/a

LEYECO IV

16.38

16.87

16.97

LEYECO V

13.49

16.64

16.38

SOLECO

15.71

15.86

16.60

NORSAMELCO

16.49

14.19

15.87

Bar chart of September 2026 residential electricity rates per kWh: BILECO ₱18.93, LEYECO IV ₱16.97, SOLECO ₱16.60, LEYECO V ₱16.38, NORSAMELCO ₱15.87 and LEYECO II ₱14.05.
September 2026 residential rates. Source: PRESYO-PH (ICSC's tracker, compiled from co-op rate disclosures).

ICSC's July 2026 list matches these for BILECO, LEYECO III, SOLECO and NORSAMELCO (ICSC), and LEYECO IV's own September post shows ₱16.9708 (LEYECO IV). Daily Tribune put LEYECO II's July rate at ₱13.26 "under the normal computation." "n/a" = no PRESYO-PH figure.

Practical ways to cut your BILECO bill

  1. Know your kWh. Compare kWh month to month, not just pesos, since the rate itself moves.
  2. Target the big loads. Aircon, refrigerator, electric water heater, flat iron. Use them less, or replace old units with efficient ones. BILECO's GM has said conserving power is the most direct way households can control their bills (PIA).
  3. Shift heavy daytime use to solar hours if you have solar or plan to.
  4. Consider rooftop solar with net metering, explained below.

How rooftop solar and net metering work in 2026

  • Who qualifies: customers with renewable energy systems up to 100 kW (RA 9513, the Renewable Energy Act; DOE).
  • How it saves: your home uses solar power first, and that saves the full retail rate. Extra power flows to the grid as a peso credit. That credit is valued at the utility's blended generation charge, not the full rate, per ERC directives as explained in Meralco's FAQ.
  • 2025 ERC amendments (Resolution No. 15, s. 2025, issued 27 Aug 2025; GMA News):
    • Credits can be banked and rolled over to future bills.
    • Credits can transfer to a new owner if the property is sold.
    • REC meters are now optional.
    • Utilities must publish their net metering forms and process online.
  • Faster processing: under EO 110's national energy emergency, a DOE advisory dated 1 April 2026 requires co-ops to finish complete applications within 10 working days. LGU permits must be acted on within 3 working days. The advisory lasts as long as the emergency declaration (DOE).
  • Brownouts: a plain grid-tie system shuts off during outages for lineworker safety. Only a properly isolated battery (hybrid) system can keep selected loads running (Meralco FAQ).

BILECO's website didn't show a net metering page when we checked. Ask BILECO directly for its current forms and fees.

(Note: RA 12017 is LEYECO II's 25-year franchise law, approved 9 Aug 2024 (Lawphil). Net metering itself comes from RA 9513.)

What solar could save you at this rate (example only)

Assumptions. These are not a quote and not a promise:

  • Sunlight: Global Solar Atlas estimates about 1,411 kWh per kWp per year for Naval, roughly 3.9 kWh/kWp/day (Global Solar Atlas). That works out to about 4.8 peak sun hours on flat ground. To allow for shade, dust, cloudy months and downtime, we use a lower 3.5 kWh/kWp/day.
  • System: 3 kWp, so 3 × 3.5 × 30 = 315 kWh/month.
  • Self-use: 60% of solar output is used directly (189 kWh). The other 40% is exported (126 kWh).
  • Rates: ₱19.6949/kWh retail (November 2026). For exports we use ₱10.4083/kWh, the generation system charge on BILECO's November 2026 schedule, as a stand-in. Under ERC Resolution No. 15, Series of 2025, Section 13, exports are credited at the co-op's generation charge excluding VAT and other generation adjustments. BILECO's November sheet shows no other generation adjustment, and ₱10.4083 does not include the ₱0.9935 generation VAT. Confirm the credit rate with BILECO.

Example math for a 300 kWh/month home:

  • Solar used at home: 189 × ₱19.6949 = ₱3,722.34 saved
  • Exported credit: 126 × ₱10.4083 = ₱1,311.45
  • Still bought from BILECO: 300 − 189 = 111 kWh × ₱19.6949 = ₱2,186.13
  • Bill after credit: ₱2,186.13 − ₱1,311.45 = about ₱874.68, versus ₱5,908.47 before

Rule of thumb from the same assumptions: each kWp makes about 105 kWh a month. That's worth about ₱2,068 if you use all of it yourself (105 × ₱19.6949), or about ₱1,093 if you export all of it (105 × ₱10.4083).

Real results depend on your roof, shading, daytime habits, weather, panel aging and future rates, which can also fall (May 2026 was ₱12.9458). For payback, divide the installed price in a real quote by the savings worked out for your own bill.

FAQ

What is BILECO's rate per kWh now? ₱19.6949/kWh for November 2026 (residential, VAT included), from BILECO's own post. October was ₱19.3628.

Why did BILECO's rate go up in November 2026? Mostly transmission, up ₱0.1816/kWh including ancillary services. Generation rose ₱0.0768, system loss ₱0.0272 and VAT ₱0.0463, per BILECO's October and November unbundled schedules. Distribution charges didn't change.

How much is a 200 kWh bill? About ₱3,939 at November's ₱19.6949 (200 × 19.6949), before the fixed charge and any discounts.

Why did rates jump in mid-2026? Higher generation costs, WESM purchases during tight supply, and line loss and congestion charges.

Does net metering pay ₱18 per exported kWh? No. Exports are credited at the blended generation charge. Self-used solar saves the full rate.

How long should net metering approval take? 10 working days for complete applications under the DOE's April 2026 advisory, while the emergency is in force.

Solar Leyte is run by MACC Systems & Energy Solutions Inc., a solar installer in Naval, Biliran.

Get a free solar quote from MACC

Pila man ang imong bill? Send us your latest BILECO bill. We'll size a system and show the savings math for your own usage, with no obligation.

Sources (rates and rate breakdown checked 20 November 2026; other sources checked 4 October 2026)

Free quote · Leyte & Biliran

Thinking about solar? Get a free quote from MACC.

Send us your monthly kWh use (it's on your BILECO or LEYECO bill) and what you want solar to do: lower your bill, keep the lights on in a brownout, or both. MACC Systems & Energy Solutions Inc. will reply with an itemised quotation.