Short answer: the co-op's own charges for a new house connection in Leyte and Biliran are small. LEYECO III and LEYECO V both charge a ₱5.00 membership fee, and the residential meter is free. The big costs are your own: the electrician, wire and materials, the town hall permit, and the bill deposit. Under the ERC's 2026 Magna Carta, that deposit can't be more than one month's estimated bill, you can pay it in three monthly instalments, and it is credited back to your bills automatically after two years of paying on time (Art. 7).
Kung magpapakabit ka ng kuryente sa bagong bahay, here's the full route: seminar, papers, inspection, and what happens to your deposit. BILECO, LEYECO III and LEYECO V publish their checklists. LEYECO II and LEYECO IV don't, so for them we give the national rules and a phone number.
Last checked 4 November 2026. Rules are quoted from ERC Resolution No. 25, Series of 2026 (Magna Carta for Electricity Consumers); co-op steps and fees are from each co-op's own website or forms, linked in the Sources. Peso examples are Solar Leyte calculations, not a co-op quote.
The short version, co-op by co-op
Co-op (area) | Seminar | Membership fee | What they publish |
|---|---|---|---|
BILECO (Biliran) | Tuesdays, 9:00 AM, main office, Caraycaray, Naval | Not published | 12-item checklist, inspection days per town, connection within 2 days of paying |
LEYECO V (Ormoc and western Leyte) | Tuesdays and Thursdays, 10:00 AM–12:00 PM, Brgy. San Pablo, Ormoc | ₱5.00 | Steps, distance and pole rules, free residential meter |
LEYECO III (Tunga) | Fridays, 8:30 AM | ₱5.00 | Checklist and forms; payment amounts left blank |
LEYECO II (Tacloban, Palo, Babatngon) | Not online | Not online | Call 0917-304-4316 |
LEYECO IV (Baybay, Hilongos and 4 towns) | Not online | Not online | Call +63 053 567-8008 |
None of them publishes its connection, inspection or processing fee amounts. Ask for the full list of charges at the seminar.
What the 2026 Magna Carta says your co-op can ask for
ERC Resolution No. 25, Series of 2026 was published on 26 August 2026 and took effect 15 days later. It covers electric co-ops like BILECO and the LEYECOs, not just Meralco.
Article 6, the papers. Utilities "shall require applicants for new electric service only" these:
- A filled-in application form.
- A valid ID (it doesn't have to show your address).
- A Certificate of Final Electrical Inspection (CFEI) or its equivalent.
- Proof you own or may use the place: title, deed of sale, lease, or the owner's written authorization. With none of these, a certificate from your sitio or purok leader, barangay captain or mayor's office, or a neighbour's affidavit sworn before a notary or a local public official, "shall suffice".
- A list of loads (your appliances).
Papers can be physical or digital. The co-op can refuse until any unpaid bills in your name with that co-op are settled.
Article 8, no meter deposit. Consumers "shall be exempt from paying meter deposits", because the meter is already in the co-op's rates. No extra fee or deposit may be charged for standard metering facilities unless the ERC expressly allows it.
The co-op checklists below are longer than Article 6's list. BILECO's still includes a fire safety certificate, a marriage contract and a 2×2 photo; they may simply predate the new rule. If you're asked for something you can't get, politely ask which rule it's based on and mention Article 6.
BILECO (Biliran): step by step
- Attend the PMOS (Pre-Membership Orientation Seminar), Tuesdays at 9:00 AM at the main office in Caraycaray, Naval. You get a certificate of attendance.
- Submit documents at the ISD office: approved electrical plan, approved electrical permit application, certificate of final inspection, fire safety inspection certificate, declaration of actual load with a detailed map, receipt for the service drop wire, marriage contract (if married), electrician's completion report, PMOS certificate, house picture, lot owner's written consent with valid ID, and a 2×2 photo.
- Inspection of your wiring against the Philippine Electrical Code, on your town's day.
- Pay the connection and other fees at the main office, 2 to 3 days after inspection.
- Connection within 2 days of payment.
Inspection day | Towns |
|---|---|
Monday | Almeria, Kawayan |
Tuesday | Biliran, Cabucgayan |
Wednesday | Naval |
Thursday | Caibiran, Culaba |
Friday | Naval |

Maripipi isn't on the list, so ask at the seminar. BILECO's numbers: (053) 500-9040 and 0905 255 9119.
LEYECO V (Ormoc and western Leyte): distance rules
LEYECO V's "How to apply" page (in Bisaya) says: attend the seminar, hire a LEYECO V-accredited barangay electrician ("Dili magkuha ug electrician nga dili akreditado"), prepare the papers, put up a service pole if needed, submit and pay the processing fee, then wait a few days for the lineman to install the meter. The lineman's service is free, and so is the meter for residential accounts.
Its membership form adds:
- ₱5.00 membership fee, if your application is accepted.
- Over 50 metres from the pole, or crossing a road or a neighbour's roof: you supply an 18-foot service pole, one for every 50 metres of wire.
- Wire at least 18 ft above the ground. Over 100 metres, add a breaker on the pole side.
- Maximum 250 metres from the tapping pole. On long runs the meter goes on the LEYECO V pole and the line to your house is yours to maintain.
- No "flying connection" (jumper) to another house.
LEYECO III (Tunga): read the payment lines
LEYECO III's checklist: information sheet, PMOS (Fridays, 8:30 AM), sketch plan and electrical permit (3 copies each), two house photos, barangay clearance, fire inspection certificate, memorandum of undertaking (signed with the owner if you're a tenant), membership application with two 1×1 photos, and a valid ID.
Its membership form sets the membership fee at ₱5.00 and has blank payment lines for service fee, inspection fee, meter deposit, service drop wire, membership ID, consumption deposit, meter base/box and service entrance materials. Given Article 8, a standard meter shouldn't carry a meter deposit, so ask if you see one on your receipt. The "consumption deposit" is the bill deposit.
The town hall part: electrical permit and CFEI
Every co-op wants an electrical permit and a final inspection certificate from your municipality. Under the National Building Code fee schedule, the basic electrical permit fee for a connected load of 5 kVA or less is ₱200, and your LGU may add other charges. Our electrical permit and CFEI guide covers the Biliran town halls.
Bill deposit: how much, and how to get it back
How much
A bill deposit guarantees you'll pay. It can't exceed "the applicant's estimated billing for one (1) month based on the submitted load schedule", and you can pay it in full or "in three (3) equal monthly installments beginning on the first bill" (Art. 34). Co-ops may also waive it or accept another guarantee. So list the appliances you really have, not every outlet.
If your load schedule would qualify you for the 100% lifeline discount (4Ps and other qualified low-income homes using 0–50 kWh a month), no deposit is required. See our lifeline rate guide.
Three worked examples
Example only (Solar Leyte calculations). kWh = watts × hours a day × 30 ÷ 1,000. Rates: BILECO October 2026 residential ₱19.3628/kWh; LEYECO IV October 2026 residential ₱17.0099/kWh plus its ₱5.00 metering customer charge. Your co-op does its own estimate.
Home | Assumed loads | kWh/month | Max deposit (one month's bill) | 3 instalments |
|---|---|---|---|---|
A: small house, Naval (BILECO) | 6 LED bulbs 9 W × 5 h; 2 fans 50 W × 8 h; TV 80 W × 5 h; ref 1 kWh/day; rice cooker 600 W × 30 min; phones and router 2 kWh | 85.1 | ₱1,648 | ₱549.26 each |
B: lifeline-size (LEYECO IV) | 4 LED bulbs × 5 h; 1 fan × 8 h; phone charging 2 kWh | 19.4 | ₱0 if you qualify for the 100% lifeline discount (normal bill ≈ ₱335) | n/a |
C: Home A + aircon (LEYECO IV) | Home A + 1 HP inverter aircon, assumed 600 W average × 8 h | 229.1 | ₱3,902 | ₱1,300.66 each |

Home A: 85.1 kWh × ₱19.3628 = ₱1,647.77, or ₱549.26 on each of your first three bills. Our appliance kWh guide has typical figures for your own list.
When it can change
After one year, and yearly after that, the co-op can adjust the deposit if your average bill differs from it by more than 10%. It must tell you before collecting more; if the deposit goes down, the excess is credited to your bills. Interest is paid at Land Bank's peso savings rate and credited yearly, and your bill should show the deposit held.
Getting it back
- Two years on time: pay "on or before the due date for two (2) consecutive years" and the refund, with interest, is credited to your bills automatically, no form needed (Art. 7). At BILECO, the due date is 10 days after you receive the bill.
- You become a 100% lifeliner: the deposit is credited back to later bills (Art. 7).
- You close the account: the deposit and interest go to any unpaid bill first, and the rest is refunded within one month of handing in the refund form and a valid ID (Art. 7).
It can come back, though. Pay late later, or lose the 100% lifeline discount, and the co-op can require a new deposit (Art. 34).
Common mistakes that delay a connection
- A non-accredited electrician. LEYECO V says so outright, and BILECO wants an electrician's completion report.
- A jumper from the neighbour. Flying connections are prohibited. Sharing one meter? Read our submeter bill guide first.
- Old unpaid bills in your name. Article 6 lets the co-op refuse until they're settled.
- Planning solar later? Tell your electrician now so the panel board has room. Net metering has its own papers; start with our BILECO and LEYECO rates guide.
FAQ
Magkano ang bill deposit sa BILECO o LEYECO? No fixed amount. It's capped at your estimated one-month bill from your list of loads (Art. 34). For a small house using about 85 kWh, that's roughly ₱1,648 at BILECO's October 2026 rate, payable in three instalments.
Do I pay for the electric meter? Not for a standard residential meter. The Magna Carta bans meter deposits (Art. 8), and LEYECO V says its residential meter is free.
I don't have a land title. Can I still apply? Yes. A lease or the owner's written authorization works, or a sitio/purok, barangay or mayor's certificate, or a neighbour's affidavit sworn before a notary or a local public official (Art. 6).
How long does it take? BILECO says you pay 2 to 3 days after inspection and get connected within 2 days of paying. LEYECO V says "a few days". Your wiring, permit and CFEI usually take longer.
Related reading
- BILECO rate per kWh in 2026
- LEYECO IV and LEYECO V rates in 2026
- How to read your electric meter
- Paying BILECO and LEYECO bills online
Solar Leyte is run by MACC Systems & Energy Solutions Inc., a solar installer in Naval, Biliran.
Get a free solar quote from MACC
Building a new house in Leyte or Biliran? Once you're connected, send us your first BILECO or LEYECO bill and we'll give you a free, no-obligation written solar quote.
- Call/Text: 0955 723 5093
- Email: official@macc-inc.com
- Website: www.macc-inc.com
- Or use the site quote form: /quote
Sources (all checked 4 November 2026)
- ERC, Resolution No. 25, Series of 2026, Magna Carta for Electricity Consumers (full text, PDF copy published by Visayan Electric): Art. 2(b) bill deposit definition; Art. 6 (only five documents; sitio/purok, barangay or mayor certificate, or neighbour affidavit before a notary or local public official; digital copies; co-op may refuse if the applicant has unpaid bills with it); Art. 7 (refund on termination within 1 month; automatic refund after 2 consecutive years on time, with interest; lifeline refunds); Art. 8 (no meter deposits; no additional fee or deposit for standard metering unless ERC authorises); Art. 34 (cap at one month's estimated bill; full or 3 equal instalments from the first bill; no deposit for 100% lifeline applicants; yearly adjustment above 10%; Land Bank peso savings rate; waiver allowed; reimposition). Also listed on the ERC Resolutions and Rules page (published 26 August 2026, BusinessMirror).
- Power Philippines, ERC strengthens consumer protection on high power bills, disconnections (30 Aug 2026): published 26 August; effective 15 days after publication.
- ISELCO II repost of the ERC press release, ERC Pinaigting ang Karapatan ng mga Konsyumer (30 Aug 2026): 2-year refund, no deposit for 100% lifeline applicants, 3 instalments.
- BILECO, Apply for New Connection (also on bileco.net): PMOS Tuesdays 9:00 AM; 12 documents; inspection days by town; pay 2–3 days after inspection; connection within 2 days.
- BILECO, Billing Information: due date 10 days after receipt of the statement of account.
- BILECO, October 2026 Effective Rate: residential ₱19.3628/kWh.
- LEYECO V, How to apply for housewiring connection: seminar Tuesdays and Thursdays 10:00 AM–12:00 PM; accredited barangay electrician; service pole over 50 m or across a road; processing fee; free lineman service; free residential meter.
- LEYECO V, Application for Membership and Power Service Connection, ISD-FM-0001 (DOCX, effective 15 Oct 2025): ₱5.00 membership fee; pole every 50 m; 18 ft clearance; breaker over 100 m; 250 m maximum; meter at the tapping pole; no flying connections.
- LEYECO III, Downloadable files: checklist of requirements for house connection (DOCX) (PMOS every Friday 8:30 AM); information sheet (DOCX); application for membership (PDF) (₱5.00 membership fee; list of payment lines).
- LEYECO II, Membership Services Division (contact 0917-304-4316; no checklist online). Service area: Republic Act No. 12017 (Lawphil), Sec. 1 (Tacloban City, Babatngon and Palo).
- LEYECO IV, October 2026 Rates: residential ₱17.0099/kWh; metering retail customer charge ₱5.00/meter/month. Contact and towns: LEYECO IV website and corporate profile.
- GMA News, ERC implements nat'l uniform subsidy rate for poor households: 0–50 kWh, 100% lifeline discount.
- National Building Code (PD 1096) IRR schedule of fees, as published by Alaminos, Laguna (PDF): electrical permit ₱200 for 5 kVA or less.
- Solar Leyte calculations (labelled in the text): kWh = W × h × 30 ÷ 1,000; 85.1 × ₱19.3628 = ₱1,647.77 (÷ 3 = ₱549.26); 19.4 × ₱17.0099 + ₱5 = ₱334.99; 229.1 × ₱17.0099 + ₱5 = ₱3,901.97 (÷ 3 = ₱1,300.66).