On 17 November 2026, Philippine shops listed single-phase kWh submeters from ₱648 to ₱1,690. The cheapest were a Dragonfly digital meter at ₱648 and a Safari digital submeter at ₱650. Cirtech analog and LCD models sat at ₱750 to ₱820, and a Chint DDS666 (Class 1, 10(60) A) was ₱1,690 at two Manila shops. Socket-type utility meters, the round kind co-ops use, cost more: ₱1,875 for a GE I-70-S analog and ₱4,800 for an Aclara I-210 digital.
But you usually don't buy your main co-op meter at all. Under the ERC's new Magna Carta for Electricity Consumers, you don't pay a meter deposit, and the co-op installs the meter and replaces a defective one at no cost to you. The meter you might actually buy is a submeter (for a boarding house, apartment or a second house on one account), a meter base, or a Wi-Fi monitoring meter to see where your kWh go. A submeter used for billing tenants has to be tested, certified and sealed by the ERC before it's installed.
Last checked: 17 November 2026 (Philippine time). Prices change often, so confirm the model, stock and seal before you pay. Listing a shop here isn't an endorsement, and Solar Leyte earns nothing from these links. Rules are quoted from ERC Resolution No. 25, Series of 2026 and ERC Resolution No. 02, Series of 2010, linked in the Sources.
Which meter do you actually need?
You want to... | Meter type | Who pays | Listed price (17 Nov 2026) |
|---|---|---|---|
Get power from BILECO or LEYECO | Co-op billing meter | The co-op (no meter deposit) | You don't buy it |
Bill tenants or a second house fairly | Single-phase submeter, ERC-sealed | You (the landlord) | ₱648–₱1,690 |
Replace a socket meter on your own board | Socket-type meter (GE, Aclara) | Ask the co-op first | ₱1,875–₱4,800 |
See your usage live on your phone | Wi-Fi DIN-rail monitoring meter | You | ₱1,104–₱2,299 (several out of stock) |
Mount the co-op's meter | Meter base (socket) | Often you; ask your co-op | ₱575–₱2,850 |
Net-metering with solar | Bidirectional meter | The co-op supplies it; for an existing residential customer, the cost difference shall not exceed ₱3,000 | You don't buy it |
kWh submeter prices in the Philippines
These are single-phase, 2-wire meters that mount on a board or wall behind the co-op meter. They're what most boarding houses and family compounds use.
Meter | Type, rating | Shop | Listed price |
|---|---|---|---|
Dragonfly electronic kWh meter | Digital (analog version sold out) | Buildmate | ₱648 (analog ₱598, sold out) |
Safari digital submeter | Digital | DMLorenzo | ₱650 (VAT included) |
Cirtech MT-30 | Analog, 10(30) A | Electx Electrical Supply | ₱750 |
Cirtech MT-60 | Analog, 60 A | Electx | ₱785 |
Cirtech MT-60i | LCD, 60 A | Electx | ₱820 |
Safari CT88 | 10(30) A, 220 V, 60 Hz | Electx | ₱1,450 |
Safari CT888 | 10(60) A, 220 V, 60 Hz | Electx | ₱1,650 |
Chint DDS666 | Electronic, Class 1, 10(60) A, 240 V | KHM Megatools and Goldpeak Tools | ₱1,690 |
A few things the price doesn't tell you:
- Current rating. In "10(60) A", 10 A is the meter's base (reference) current and 60 A is the most it's rated to carry. Match that maximum to the breaker on the circuit: a 10(30) A meter behind a 40 A breaker can be pushed past its rating.
- Accuracy class. KHM and Goldpeak list the Chint DDS666 as Class 1 (about ±1% error). The cheaper listings above don't state a class at all.
- "ERC approved" in a listing title isn't an ERC seal. The Dragonfly listing says "ERC APPROVED". Under the ERC rules, the seal goes on each individual meter after it's tested. Ask the seller whether the unit you're buying carries one.
Utility-grade socket meters and meter bases
Socket meters plug into a round or square meter base with 4 or more jaws. They're the type co-ops install outside houses.
Item | Detail | Shop | Listed price |
|---|---|---|---|
GE I-70-S | Analog, single phase 2-wire, CL100, 4 jaws, 220 V | Electx | ₱1,875 |
Aclara I-210+ FM1S | Digital, single phase 2-wire, CL200, 4 jaws | Electx | ₱4,800 |
Aclara I-210 FM2S | Digital, single phase 3-wire, CL200 | Electx | ₱4,800 |
Aclara KV2c (FM2S, FM12S and others) | Commercial/3-phase, 200 A | Electx | ₱32,700 |
Cirtech round meter base | 1/2", 3/4" or 1" hub | Electx | ₱575 |
USA round meter base | 3/4" or 1" hub, 100 A | Electx | ₱710 |
Cirtech square meter base | 4 or 5 jaws, max 200 A | Electx | ₱2,500 |
Cirtech rectangular meter base | 4 jaws, max 200 A | Electx | ₱2,850 |

Don't swap out the co-op's meter yourself. The co-op installs it (Magna Carta Art. 9A). Under RA 7832 Sec. 4(a)(iv), a tampered, broken, or fake seal on the meter is prima facie evidence of illegal use of electricity by the person benefited, but only if the discovery is personally witnessed and attested to by an officer of the law or a duly authorized ERC (formerly ERB) representative. Disconnection still requires due notice.
Who buys the meter base depends on your co-op. LEYECO III's application form, for example, lists "Meter Base/Box" and "Service Entrance Materials" as payment lines next to the membership and inspection fees. So ask before you buy one. The current LEYECO III application form still lists a "Meter Deposit" line; Magna Carta Art. 8 bars meter deposits for standard meters unless the ERC authorises them, so ask about it. Our new connection cost guide walks through each co-op's checklist.
Do you pay for your BILECO or LEYECO meter?
Normally, no. ERC Resolution No. 25, Series of 2026 (the Magna Carta for Electricity Consumers, in effect since September 2026) says:
- No meter deposit (Art. 8). The cost of watt-hour meters is already in the utility's rate base, and "no additional fee or deposit shall be collected for the provision, installation, or replacement of standard metering facilities, except as may be expressly authorized by the Commission."
- The co-op installs the meter (Art. 9A) and replaces a defective or damaged one at no cost to you (Art. 9B).
- Every meter must be ERC-tested and sealed (Art. 9E) before it's put in service.
- A free accuracy test once every two years (Art. 12A), unless the meter was already tested in that period. If you ask more often and the meter is within plus or minus two percent (+/- 2%), the co-op may charge a testing fee equal to the ERC's (Art. 12C). If a test shows the meter's average error exceeds plus two percent (+2%), meaning it runs fast, you're entitled to a refund covering up to six months (Art. 10(B)).
If your new-connection receipt shows a "meter deposit", ask the co-op what it's for. If you think your meter is fast, our guide to reading your electric meter has a self-check you can do tonight.
Submeters for boarding houses: the ERC rules
If you bill tenants from your own co-op account, the ERC treats you as a "redistributor". The rules are in Article VI of the Distribution Services and Open Access Rules, as amended by ERC Resolution No. 02, Series of 2010:
- DSOAR rules on submetering require landlords to use properly sealed submeters and bar charging tenants for profit above the co-op's rate; check with your co-op or the ERC for the exact text.
- You can't charge more per kWh than the co-op charges you, and you can't profit from it.
We didn't find a published per-meter ERC fee for sealing a landlord's submeter, so ask the ERC before you buy several. How to split the bill fairly is in our submeter bill computation guide.
Example A: submeters for a 4-room boarding house
Example only. Prices are the shop listings above; labour, wire, enclosures and any ERC testing fee are not included.
Option | Meter | Per meter | 4 rooms |
|---|---|---|---|
Budget | Cirtech MT-60i (LCD, 60 A) | ₱820 | ₱3,280 |
Mid | Safari CT888 (10(60) A) | ₱1,650 | ₱6,600 |
Class 1 | Chint DDS666 (10(60) A) | ₱1,690 | ₱6,760 |
The gap between budget and Class 1 is ₱3,480 for four rooms. Whichever you pick, get it sealed before tenants start paying from it, and photograph the reading on move-in day.
Example B: what a 2% meter error is worth
Example with assumptions: a room using 120 kWh a month at BILECO's October 2026 residential rate of ₱19.3628 per kWh. Solar Leyte calculation.
- 2% of 120 kWh = 2.4 kWh a month
- 2.4 × ₱19.3628 = ₱46.47 a month, or ₱557.64 a year
- Across 4 rooms: about ₱2,231 a year
The Magna Carta uses plus or minus two percent (+/- 2%) to decide whether a repeat accuracy test can be charged (Art. 12C). A refund applies only if the meter runs fast, meaning its average error exceeds plus two percent (+2%) (Art. 10(B)). A 2% error still costs someone real money over a year. That's why a sealed, tested meter is worth the extra few hundred pesos. Check your own numbers with our electricity bill calculator.

Wi-Fi monitoring meters: useful, but not for billing
These clip onto a DIN rail in your panel and show voltage, watts and kWh on your phone (Tuya / Smart Life apps).
Meter | Shop | Listed price | Stock (17 Nov 2026) |
|---|---|---|---|
Atorch GR2PWS (Wi-Fi, 100 A, built-in switch) | PowerCentral | ₱1,104 | Out of stock |
Atorch AT4PW (Wi-Fi / Bluetooth, 100 A) | PowerCentral | ₱1,249–₱1,338 | Out of stock |
Peacefair PZIOT-E01 (Wi-Fi, 100 A) | CreateLabz | ₱1,640 | Out of stock |
Unbranded Tuya DIN-rail meter (1%) | Fruugo PH (ships from China) | ₱2,299 + ₱496.49 shipping | In stock |
They aren't ERC-sealed, so you can't use them to bill tenants, and they can't replace the co-op's meter: the ERC rules say no meter goes into service unless it's tested, certified and sealed by the ERC. What they're good for is finding where your kWh go.
Example C: catching a pump that won't switch off
Example with assumptions: a 0.75 kW (1 HP) water pump whose float switch sticks and runs 4 extra hours a day for a month, at BILECO's October 2026 rate. Solar Leyte calculation.
- 0.75 kW × 4 h × 30 days = 90 kWh
- 90 × ₱19.3628 = ₱1,742.65 extra on one bill
That's more than the price of most of the monitoring meters above. If your bill jumped and you can't see why, our guide on why your electric bill went up covers rate changes versus usage changes.
Bidirectional meters for net metering
You don't buy a net-metering meter from a shop. The co-op supplies the bidirectional meter. For a residential installation filed by an existing customer, the difference in cost the co-op may charge to replace your meter with the required bidirectional meter shall not exceed ₱3,000 (ERC Advisory, 22 September 2025, as quoted in Meralco's net-metering document list). Wi-Fi "bi-directional" meters sold online aren't ERC-sealed, so they can't stand in for it. The full process is in our BILECO net-metering guide.
Thinking about solar instead?
A submeter tells you who used the power; solar cuts how much you buy. If the common-area pump, lights and your own unit make up a big share of the bill, rooftop solar can trim that part. Use the electricity bill calculator to see your monthly kWh, then ask for a quote if the numbers look worth it.
FAQ
How much is a kWh meter in the Philippines?
On 17 November 2026, single-phase submeters were listed from ₱648 (Dragonfly digital) to ₱1,690 (Chint DDS666). Socket-type utility meters were ₱1,875 (GE I-70-S analog) to ₱4,800 (Aclara I-210 digital).
Do I have to pay for my BILECO or LEYECO meter?
Normally no. ERC Resolution No. 25, Series of 2026 says consumers don't pay meter deposits and no extra fee is collected for providing, installing or replacing standard meters unless the ERC authorises it. A defective meter is replaced at no cost to you.
Kailangan bang may ERC seal ang submeter?
Oo. Sa ilalim ng ERC Resolution No. 02, Series of 2010, ang DSOAR rules sa submetering ay humihingi na gumamit ang landlord ng maayos na naka-seal na submeter, at bawal kumuha ng tubo sa kuryente nang lampas sa rate ng co-op. Tanungin ang co-op o ang ERC para sa eksaktong teksto.
Can I use a Wi-Fi smart meter to bill my tenants?
No. The ones sold online aren't ERC-sealed, so they're for monitoring only. Use a sealed submeter for billing.
Solar Leyte is run by MACC Systems & Energy Solutions Inc., a solar installer in Naval, Biliran.
Get a free solar quote from MACC
Running a boarding house or a family compound on one BILECO or LEYECO account? Send us a recent bill and we'll show you how much of it solar could cover. Free, no-obligation written quote.
- Call/Text: 0955 723 5093
- Email: official@macc-inc.com
- Website: www.macc-inc.com
- Or use the site quote form: /quote
Related guides
- BILECO and LEYECO electricity rates: how to read your bill
- Electric bill computation, line by line
- How to compute a submeter electric bill
- How to read your electric meter
- How many kWh your appliances use
Sources (all checked 17 November 2026)
- Electx Electrical Supply, kWh meter and submeter collection: Cirtech MT-60i ₱820, MT-60 ₱785, MT-30 ₱750; Safari CT88 ₱1,450 and CT888 10(60) A ₱1,650; GE I-70-S ₱1,875; Aclara I-210+ FM1S and I-210 FM2S ₱4,800; Aclara KV2c ₱32,700; meter bases ₱575–₱2,850 (collection product data, 17 Nov).
- Buildmate: Dragonfly electronic kWh meter: digital ₱648, analog ₱598 (sold out); "ERC APPROVED" in the listing.
- DMLorenzo: Safari digital submeter: ₱650, VAT included.
- Chint DDS666, Class 1, 10(60) A, 240 V, 60 Hz: KHM Megatools ₱1,690 and Goldpeak Tools PH ₱1,690.
- PowerCentral: Atorch GR2PWS ₱1,104 and Atorch AT4PW ₱1,249 / ₱1,338 (both out of stock); CreateLabz: Peacefair PZIOT-E01 ₱1,640 (out of stock); Fruugo PH: Tuya Wi-Fi DIN-rail meter ₱2,299 + ₱496.49 shipping, ships from China.
- ERC Resolution No. 25, Series of 2026, Magna Carta for Electricity Consumers (PDF copy published by Visayan Electric): Art. 8 (no meter deposit; no additional fee for standard metering unless ERC-authorised), Art. 9A, 9B, 9D, 9E, Art. 12A (free accuracy test once every two years, unless the meter was already tested in that period), Art. 12C (testing fee if you ask more often and the meter is within +/- 2%), Art. 10(B) (refund covering up to six months if the meter's average error exceeds +2%). Also on the ERC website.
- ERC Resolution No. 02, Series of 2010 (amended DSOAR), on LegalDex; the resolution is also on the Supreme Court E-Library. Check with your co-op or the ERC for the exact submetering text.
- LEYECO III application for membership and service connection (PDF): "List of Payments" includes Meter Base/Box, Service Entrance Materials, and a Meter Deposit line (Art. 8 bars meter deposits for standard meters unless ERC-authorised; ask about it).
- Meralco net-metering list of documents (PDF): for a residential installation filed by an existing customer, the difference in cost shall not exceed ₱3,000, per ERC Advisory dated 22 September 2025.
- BILECO October 2026 effective rates: residential ₱19.3628 per kWh (latest posted on BILECO's power-rate page as of 17 November 2026).
- RA 7832, Anti-Electricity and Electric Transmission Lines/Materials Pilferage Act (Lawphil): Sec. 4(a)(iv), a tampered, broken or fake seal is prima facie evidence of illegal use by the person benefited, subject to the witnessing and attestation proviso at the end of Sec. 4(a)(viii). Disconnection still requires due notice.
- Examples A, B and C are Solar Leyte calculations from the figures above; room usage, pump size and run time are assumptions.