Electric Bill Computation, Line by Line: Every Charge on a BILECO Bill Explained (October 2026)

Your electric bill is your kWh times about 20 separate charges, plus a small fixed fee. We take BILECO's own October 2026 unbundled rate sheet, explain every line in plain English, show what changed from September (including the VAT removed from system loss), and work out a 150 kWh bill peso by peso.

Short answer: your bill is the kWh you used times your co-op's "effective rate", plus a small fixed monthly charge. At BILECO in October 2026 that's ₱19.3628 per kWh plus ₱5.00 a month for a home. So 150 kWh comes to 150 × ₱19.3628 + ₱5.00 = ₱2,909.42.

That ₱19.3628 isn't one price, though. It's about 20 separate charges added together, and BILECO now posts every one of them in its monthly "Unbundled Rate Schedule". Below we go through the October 2026 sheet line by line, say who gets each peso, and show what moved since September.

Last checked: 16 November 2026. BILECO hadn't posted a November 2026 rate yet when we checked.

Step 1: Work out your kWh

Every computation starts with how many kWh you used:

kWh used = present reading − previous reading (times a multiplier, if your bill shows one; ordinary homes usually don't have one).

Example only: previous reading 12,340, present reading 12,490, so you used 150 kWh.

BILECO reads meters over an 11-day period that starts on the 19th of each month, and its meter readers print and hand you the bill on the spot (BILECO billing information). If you're not sure the reading is right, our guide on how to read your electric meter shows how to check it yourself.

Step 2: Multiply by the effective rate, then add the fixed charge

BILECO's posted residential rate for October 2026 is ₱19.3628/kWh (BILECO October 2026 rate). The signed rate sheet attached to that post shows a residential "Fixed charged" of ₱5.0000. That's the metering "retail customer charge", billed once a month no matter how much you use.

So a home's bill is:

Bill = kWh × ₱19.3628 + ₱5.00, before any discount, arrears or penalty.

Want to skip the math? Our electricity calculator does it with your own kWh and appliances.

Every line on BILECO's October 2026 rate sheet

Here's the residential column of BILECO's unbundled rate schedule for October 2026, read from the signed sheet on BILECO's October rate page. The "150 kWh" column is our own multiplication.

Line on the sheet

₱ per kWh

On 150 kWh

Who gets it

Generation system charge

10.3315

₱1,549.72

Power suppliers and the spot market

Transmission system charge

0.6399

₱95.98

NGCP (the grid)

Ancillary service charge

1.2939

₱194.09

Grid reserves, via NGCP

System loss charge

1.8394

₱275.91

Power lost on the way to you

Distribution system charge

1.0557

₱158.36

BILECO

Supply system charge

1.0282

₱154.23

BILECO

Metering system charge

0.5792

₱86.88

BILECO

MCC (reinvestment fund)

0.5324

₱79.86

BILECO capital projects

Missionary electrification

0.3296

₱49.44

Universal charge (via PSALM)

Environmental charge

0.0025

₱0.38

Universal charge

Cash incentive for RE developers

0.0101

₱1.51

Universal charge

FIT-All (renewable)

0.4707

₱70.61

Renewable energy fund (TransCo)

GEA-All (renewable)

0.0000

₱0.00

Suspended for now

NPC stranded debt

0.0428

₱6.42

Universal charge

Lifeline rate subsidy

0.0100

₱1.50

Discount for low-income users

Senior citizen subsidy

0.0011

₱0.17

Discount for qualified seniors

Renewable Energy Certificate

0.0089

₱1.33

Renewable energy rules (RPS)

VAT on generation

0.9693

₱145.40

Government

VAT on transmission

0.0722

₱10.83

Government

VAT on ancillary services

0.1454

₱21.81

Government

VAT on system loss

0.0000

₱0.00

Removed from October 2026

Effective rate

19.3628

₱2,904.42

Fixed metering charge (per month)

₱5.00

BILECO

Total for 150 kWh

₱2,909.42

We added up every line ourselves and got exactly ₱19.3628, the same as BILECO's effective rate. The 150 kWh lines add to ₱2,904.43 because each line is rounded to the centavo. Your bill is computed on the total rate, so it shows ₱2,904.42.

One thing to know: the sheet also lists "12%" next to VAT on distribution and "others", but with no peso amount, and the ₱19.3628 adds up without them. If your printed bill shows a separate VAT line on distribution, ask BILECO which amount it's based on.

What each charge means, in plain English

Generation (₱10.3315, about 53% of the rate)

This is the electricity itself. BILECO buys it from power suppliers under contracts and from the spot market, then passes the cost on to members "without any additions or reductions", as its billing page puts it (BILECO). That page says generation is "roughly 45%" of the rate. In October it was about 53% (our calculation). It's the line that moves the most each month. For why it's so high in Biliran, see bakit mahal ang kuryente. For the spot-market part, see our Visayas WESM price tracker.

Transmission and ancillary services (₱1.9338 together)

Transmission pays NGCP to move power over the high-voltage grid. Ancillary services are the backup reserves that keep the grid stable when a plant trips. Since the ERC's Resolution No. 4, Series of 2026, utilities have to show this as its own line instead of hiding it inside transmission. It isn't a new charge (Inquirer).

At BILECO, the ancillary line (₱1.2939) is now twice the size of the transmission line itself (₱0.6399). That fits what the ERC found: in 2025 the reserve market added ₱1.29/kWh to Visayas rates, versus ₱0.02/kWh for contracted reserves. The ERC suspended the reserve market in October 2026 to bring those costs down (BusinessWorld, 13 Oct 2026). Watch this line on your next few bills.

System loss (₱1.8394)

Some power never reaches a paying meter. It's lost as heat in wires and transformers, or to illegal connections and bad meters. The co-op can pass on these losses only up to a cap set by the ERC.

New from October 2026: no more VAT on it. ERC Resolutions No. 26 and 28, Series of 2026, and BIR RMC No. 97-2026 took the 12% VAT off the allowable system loss charge, starting with October billing (Rappler; Philstar). You can see it on BILECO's sheets: VAT on system loss was ₱0.2351/kWh in September and ₱0.0000 in October. The system loss charge itself stays.

Distribution, supply, metering and MCC (₱3.1955 together, BILECO's own share)

Only the distribution, supply and metering lines are BILECO's own service charges: running the lines, billing and collection, and the meters. MCC is also collected by BILECO, but it's a reinvestment fund for approved capital projects, not profit — the old name for the Reinvestment Fund for Sustainable CAPEX (RFSC). All four of these lines stay the same until the ERC approves a change, and all four were identical in September and October. The ERC renamed it in 2011, but its purpose stayed the same (ERC Resolution No. 14, s. 2011). BILECO's own page calls it the RFSC (BILECO).

Universal charges and FIT-All (₱0.8557 together)

These are the same for every power user in the country and are set by the ERC. Missionary electrification pays for power in off-grid islands. The environmental charge, the cash incentive for renewable developers and NPC stranded debt are the other small universal charges. BILECO says universal charges are remitted to PSALM (BILECO).

FIT-All funds the guaranteed rates paid to qualified renewable plants. In August 2026 the ERC provisionally raised it from ₱0.2011 to ₱0.3359/kWh in ERC Case 2026-084 RC, via NGCP Bulletin 2026-46 and Context.ph. BILECO's own August sheet already showed ₱0.2417, which is neither of those two figures (BILECO August 2026 sheet). BILECO's October line is ₱0.4707, which is ₱0.1348 above the new ₱0.3359 rate. That gap is consistent with a one-month catch-up, but it isn't confirmed, so ask BILECO if you want to check. GEA-All is ₱0.0000 because the ERC suspended its collection for the September to December 2026 billing months (ZAMECO I, citing the ERC's 19 Aug 2026 advisory).

Subsidies and REC (₱0.0200 together)

The lifeline subsidy line (₱0.0100) and senior citizen subsidy line (₱0.0011) are what everyone else pays so that qualified low-income homes and seniors get their discounts. If that's you, see our lifeline rate and senior citizen discount guide. The Renewable Energy Certificate line comes from the Renewable Portfolio Standards, explained in our RPS guide.

VAT (₱1.1869 in October)

On BILECO's October sheet, VAT is charged on generation, transmission and ancillary services. One reason VAT on generation can swing from month to month: power from renewable sources is zero-rated for VAT (Philstar), so VAT depends on which plants BILECO bought from. BILECO's sheet doesn't give the reason for October's change.

Where ₱1 of the October rate went

Grouping the lines above (our calculation, residential, October 2026):

Group

₱ per kWh

Share

Generation

10.3315

53.4%

BILECO distribution, supply, metering and MCC

3.1955

16.5%

Transmission and ancillary services

1.9338

10.0%

System loss

1.8394

9.5%

VAT

1.1869

6.1%

Universal charges and FIT-All

0.8557

4.4%

Subsidies and REC

0.0200

0.1%

Total

19.3628

100%

Bar chart of BILECO's October 2026 residential rate of ₱19.3628 per kWh by group: generation ₱10.3315 (53.4%), BILECO distribution, supply, metering and MCC ₱3.1955 (16.5%), transmission and ancillary services ₱1.9338 (10.0%), system loss ₱1.8394 (9.5%), VAT ₱1.1869 (6.1%), universal charges and FIT-All ₱0.8557 (4.4%), subsidies and REC ₱0.0200 (0.1%).
BILECO's October 2026 residential rate grouped by who gets the money. Source: BILECO unbundled rate schedule, October 2026; grouping is Solar Leyte's.

So about 16 centavos of every peso are collected by BILECO: its own service charges plus the MCC reinvestment fund, which is not profit. Most of the rest pays for the electricity and the grid that delivers it.

What changed from September to October 2026

BILECO's September sheet totals ₱18.9275/kWh (BILECO September 2026 rate). October is ₱0.4353 higher. Line by line (our subtraction of the two signed sheets):

Line

September

October

Change

Generation

9.5036

10.3315

+0.8279

FIT-All

0.2011

0.4707

+0.2696

System loss

1.6850

1.8394

+0.1544

Ancillary services

1.1539

1.2939

+0.1400

Missionary electrification

0.2662

0.3296

+0.0634

Transmission + senior subsidy + VAT on ancillary

+0.0165

VAT on transmission

0.0728

0.0722

−0.0006

VAT on system loss

0.2351

0.0000

−0.2351

VAT on generation

1.7701

0.9693

−0.8008

Total

18.9275

19.3628

+0.4353

Bar chart of changes in BILECO's residential rate lines from September to October 2026: generation up ₱0.8279, FIT-All up ₱0.2696, system loss up ₱0.1544, ancillary services up ₱0.1400, missionary electrification up ₱0.0634, VAT on system loss down ₱0.2351 to zero and VAT on generation down ₱0.8008. Net change +₱0.4353 per kWh.
Line-by-line change in BILECO's residential rate, September to October 2026. Source: BILECO unbundled rate schedules; differences are Solar Leyte's calculation.

On 150 kWh that's about ₱65 more than September (our calculation). Without the lower VAT, October would have gone up by roughly ₱1.47/kWh instead. The ₱0.0634 rise in missionary electrification matches the ERC-directed increase that ZAMECO I says is collectible for 36 months or until fully recovered (ZAMECO I).

If your bill jumped by more than this, the rate probably isn't the main cause. Our bakit tumaas ang bill ng kuryente checklist helps you split it into rate, billing days and kWh.

Other things on the printed bill

BILECO lists what its billing statement shows: account number and name, meter serial number, billing period, present and previous readings, kWh consumption, basic rates and other charges, total current bill, due date, surcharge after due date, total amount after due date, and disconnection date (BILECO).

  • Due date: 10 days after you receive the bill, per BILECO's page.
  • Late payment charge: BILECO's page still lists 3%. The ERC's new "other charges" rules cap late fees at 2% once co-ops adopt them. Our disconnection and reconnection guide has the details and timing.
  • Business accounts: commercial accounts pay a lower ₱17.8574/kWh but a bigger fixed charge: ₱42.82 supply plus ₱29.12 metering, or ₱71.94 a month, on the same October sheet.

Paying online? See how to pay your BILECO or LEYECO bill online.

Same idea at the LEYECO co-ops

The LEYECO co-ops use the same building blocks, so the same formula works: your kWh times their effective rate, plus their fixed charge. LEYECO IV, for example, also posts a ₱5.00 monthly fixed charge. Each co-op's latest numbers are in our trackers:

What this means if you're thinking about solar

Every kWh your panels make and you use right away saves you the whole effective rate, ₱19.36 at BILECO in October. Under net metering, kWh you export to the grid are credited at the co-op's generation charge — the system charge, excluding VAT and other generation adjustments (ERC Resolution No. 15, s. 2025, Sec. 13). In October that's ₱10.3315 at BILECO. That's why sizing solar to your daytime use matters more than exporting a lot. Our net metering guide explains the rules. To see what your own bill would look like, plug your kWh into the electricity calculator.

FAQ

How do I compute my electric bill in the Philippines?

Take your kWh used (present minus previous reading), multiply by your co-op's effective rate for that month, and add the fixed monthly charge. At BILECO in October 2026 that's kWh × ₱19.3628 + ₱5.00. Discounts, arrears and penalties come on top.

Paano mag-compute ng bill sa kuryente?

Ibawas ang previous reading sa present reading para makuha ang kWh. I-multiply ito sa effective rate ng co-op (₱19.3628 sa BILECO noong Oktubre 2026), tapos idagdag ang ₱5.00 na fixed charge. Halimbawa: 150 kWh × ₱19.3628 + ₱5.00 = ₱2,909.42.

What is the system loss charge on my bill?

It's the cost of power lost between the grid and the meters, up to the ERC's allowed cap. Since October 2026 billing there's no more VAT on the allowable system loss charge, but the charge itself stays. It was ₱1.8394/kWh at BILECO in October.

Why is the generation charge so big?

It's the electricity itself, bought from power plants and the spot market, and passed on at cost. At BILECO it was ₱10.3315 of the ₱19.3628 October rate, about 53%.

Does BILECO make money on all these charges?

No. Only the distribution, supply and metering lines are BILECO's own service charges. MCC (RFSC) is also collected by BILECO, but it's a reinvestment fund for approved capital projects, not profit. Generation, transmission, universal charges and VAT are passed through to suppliers, NGCP, government funds and the BIR.

Solar Leyte is run by MACC Systems & Energy Solutions Inc., a solar installer in Naval, Biliran.

Get a free solar quote from MACC

Now that you know where each peso goes, see how much of it solar could cut. Send us your latest BILECO or LEYECO bill and we'll prepare a free, no-obligation written quote.

Related guides

Sources (all checked 16 November 2026)

  • BILECO, October 2026 Effective Rate (posted 20 October 2026): residential ₱19.3628/kWh; commercial, public building and street light ₱17.8574/kWh; plus the attached signed "Unbundled Rate Schedule for the Month of October 2026" (every residential line in the table above; fixed charge ₱5.0000 residential, ₱71.9400 commercial; distribution and others VAT shown as "12%").
  • BILECO, September 2026 Effective Rate and the signed September 2026 unbundled rate schedule (₱18.9275 total; generation ₱9.5036, FIT-All ₱0.2011, system loss ₱1.6850, ancillary ₱1.1539, missionary electrification ₱0.2662, VAT on generation ₱1.7701, on system loss ₱0.2351). The power-rate list showed no November 2026 post on 16 November 2026.
  • BILECO, August 2026 unbundled rate sheet: FIT-All already ₱0.2417, which is neither the old ₱0.2011 rate nor the new provisional ₱0.3359 rate.
  • BILECO, Billing Information: reading period from the 19th, 11 days; due date 10 days after receipt; 3% late penalty; bill contents; nine rate components; generation "roughly 45%"; universal charge remitted to PSALM.
  • Inquirer, ERC requires more transparent electricity bills: ERC Resolution No. 4 and No. 22, Series of 2026; ancillary services shown separately; not a new charge.
  • BusinessWorld, ERC suspends reserve market, orders revamp to lower costs (13 Oct 2026): reserve market added ₱1.29/kWh in the Visayas in 2025 vs ₱0.02/kWh for contracts.
  • Rappler, No more VAT on system loss in electricity bills starting October and Philstar, BIR scraps VAT on system loss charge (15 Sep 2026): ERC Resolution No. 26, Series of 2026; BIR RMC No. 97-2026; the system loss charge itself remains.
  • NGCP, Customer Bulletin 2026-46 (24 August 2026): ERC Order in Case No. 2026-084 RC (31 July 2026) provisionally authorised TransCo to collect a FIT-All rate of ₱0.3359/kWh (₱0.2011 + ₱0.1348) from the August 2026 billing month.
  • Context.ph, ERC approves provisional FIT-All rate hike to ₱0.3359 per kWh (2 Aug 2026): from ₱0.2011, +₱0.1348.
  • ZAMECO I, Power rates for October 2026: UC-ME +₱0.0634/kWh collectible for 36 months or until fully recovered; GEA-All suspended for September to December 2026 billing months (ERC advisory, 19 Aug 2026); ERC Resolutions 26 and 28, s. 2026.
  • ERC, Resolution No. 14, Series of 2011 (Supreme Court E-Library): MCC renamed RFSC; same nature and purpose.
  • ERC, Resolution No. 15, Series of 2025, Sec. 13 (as summarised by Ocampo & Suralvo): net-metering export credits are at the co-op's generation system charge, excluding VAT and other generation adjustments. Official ERC PDFs were not reachable when we checked.
  • Philstar, Power co-ops not exempt from VAT, says BIR (12 Dec 2013): power from renewable sources is subject to 0% VAT.
  • Solar Leyte calculations (labelled in the text): line totals and the 150 kWh example, group shares, September-to-October differences, ₱65 on 150 kWh, and the "roughly ₱1.47" without lower VAT (₱0.4353 + ₱0.8008 + ₱0.2351 + ₱0.0006 = ₱1.4718).

Free quote · Leyte & Biliran

Thinking about solar? Get a free quote from MACC.

Send us your monthly kWh use (it's on your BILECO or LEYECO bill) and what you want solar to do: lower your bill, keep the lights on in a brownout, or both. MACC Systems & Energy Solutions Inc. will reply with an itemised quotation.